草在线视频免费看_日韩激情久久久久久久_日本A级黄色电影_国产欧美精品一区二区三区四区_伊人中文在线特级做a_AAA淫片免费在线播放_国产AV无码一区_欧美中日韩黄色片_欧美性爱三级视频_成人性爱在线热视频

86-15237383444
EXPLAIN

Description And Aufbau Principle Of G263 Series Disc Loom

Release:hnfzpj Click:19262

This article focuses on the description and Aufbau principle of G263 series disc Loom. We use drawings such as the principle of bobbin changing and picking to give a detailed and comprehensive introduction to the automatic bobbin changing structure, so that the textile industry can be fully familiar with the description of Loom, the principle of Loom, the parameters of Loom, and the principle of disc looms, and meet the requirements of improving the innovative production and maintenance technology of Loom and updating the equipment of Loom in China.

Description of the process of automatic filament changing on the Loom

Introduction:

G263 (Z) disc loom is a cotton loom suitable for weaving pure cotton and blended cotton yarn. It is suitable for weaving fabrics with a weft density of 40-80 pieces/inch. There are mainly three types of loom door widths: G263-1250mm, G263Z-1350mm, and G263Z-1500mm. The machine speed is 185-200r/min, and the warp disc adopts φ 550mm or φ 600mm, equipped with the same motor as the 1511 and 1515 models -0.8KW.

(1) Shuttle size: 390mmX48mm X35mm (total shuttle length X shuttle bottom width X shuttle wall height)

(2) Size of weft tube with iron hoop: 190mm long, outer diameter of weft tube hoop 27mm

(3) Reed size: 1302mm long X 120mm high, 1404mmX120mm, 1578mm X120mm (calculated according to the door width of the Loom).

Hand drawn drawings of G263 automatic filament changing loom

When the G263 disc Loom works normally, it operates smoothly, the three spindles rotate flexibly, the axial clearance is less than 0.4mm, the crankshaft gear and the pedal shaft gear are well matched, and the tooth side clearance is less than 1.5mm. When the clutch starts working, the fully opened shuttle opening should be clear, and there should be no abnormal clamping phenomenon when the shuttle enters and exits the shuttle track.

(1) The reed seat of the disc loom is located at the lower warp surface of the rear center shed, which is about 1mm away from the plane of the shuttle board or flat, and cannot cause friction with the shuttle board. When the reed seat is in the rear center, a gap of 15-20mm should be maintained between the front heald frame and the reed cap.

(2) The surface of the tread plate has good contact with the surface of the tread rotor, and the parallelism of the contact surface is 0.2mm.

(3) The surface contact between the shuttle rotor and the shuttle nose is good, with a parallelism of 0.1mm on the contact surface. The angle between the shuttle box bottom plate, the shuttle box back plate, and the shuttle box front plate is 86.5 °.

(4) Shuttle box width: the inner side is the width of the shuttle+3mm, and the outer side is the width of the shuttle+1.6mm; Shuttle box height: The inner side is the shuttle height+4mm, and the outer side is the shuttle height+2mm.

(5) The shuttle surface at the junction of the shuttle box bottom plate and the shuttle board must be flush, with a horizontal shuttle board arc (concave) of 1.5mm and a steel reed (convex) of 1.5mm.

(6) The relative displacement of the coiling hook is three teeth and a half, the gap between the side support box and the steel reed is 1.6mm, and the distance between the side support cover edge and the shuttle plate surface is 22mm (G263) and 32mm (G263Z).

The Principle of Automatic Shuttle Changing Loom Picking

Technical requirements for fiber exchange system:

(1) The ratchet sleeve rotates flexibly, and the three pawls have good contact with the ratchet. When the handle is pulled and released again, the ratchet can rotate one tooth on its own.

(2) The positions of the disc, keyboard, and yarn guide are aligned with each other, and the guide iron plane is flush with or retracted by 0.5mm from the concave surface of the disc

(3) The gap between the curved surface of the replacement hammer and the pipe clamp: 3mm when lifting up and 1mm when pressing down.

Process Diagram of Fiber Replacement on G263Z Disc Loom

The above is the description of the G263 Loom and the principle of the G263Z Loom. The attached picture is the Aufbau principle diagram of the disc Loom. The different design methods of the disc Loom are complementary to the types of fabric changing and shuttle changing looms, which are based on reducing the failure rate and improving the production efficiency.

FriendLink: BaiDu  Ecer  Xinda Textile  Ec21  Ecplaza  Chinatexnet  
Copyright © 2016 Xinxiang City Xinda Textile Machinery Parts Co. Ltd 【MANAGE】
ADDRESS:5F West, Unit 53A, Zone A, Huicheng Port Bay, Huixian City, Henan Province,China CONTACT:Mr Yang MOBILE:86-15237383444
TEL:+86-0373-6235050 FAX:+86-0373-6235050 E-MAIL:309816745@qq.com
WEB:http://www.fsccmp.cn
SERVICE
TEL:0373-6235050
主站蜘蛛池模板: 人人操人人操人人操人人操人人操人人| av天天av无码av天天爽| 无码1区2区3区| 亚洲美女在线精品视频| 99精品无码综合| 看a级片基地绯色AV网| 黄片在线高清无码| AV无码激情成人性交片子| 无码AV高清强奸三级片| 日本香蕉视频免费在线| A级片无码视频在线播放| 能看黄片网站大全| 欧美激情一区二区三区四在线视频 | 成人性交三.级大片| 黄片毛片视频无码大全| 久久久久久久在视频| 人人操人人舔人人爽| 人妻少妇看AA片偷人精品| 欧美a在线观看伊人乱伦| 成人亚洲欧洲高清一二区| 一级无码黄色视频免费观看| 日韩aaaa婷婷成人俺也想| 人人干人人操人人做| 狠狠干成人综合网| 六月伊人av色人一二区| 成人AV视屏网址在线观看| 让人高潮的A片av网观看| 国产日韩精品在线观看| 国模一区v二区| 毛片在哪里可以看| 99精品久久久欧美高清A| 成人91AV视频| 黄色视频图片免费看| 亚洲AV首页久草加勒比在线| 三级无码AⅤ在线三级片视频| 成年人可观看A片| 超清无码av毛片| 免费成人黄色视频电影| 无码人妻在线播放视频三级片片| 亚洲伊人欧美无码使劲操久久| 国产成人AV在线|